The tests focused first on Integration
of SCT into ATLAS run partition |
|
New TDAQ version |
|
The first day, cooling plant shutdown
due to a series of problems mainly due to the control system and took 24 h to
solve |
|
The second day checking SCT with ATLAS
Trigger |
|
1kHz random triggers from CTP |
|
some evidence of moving BCID mismatch (not understood) |
|
ECRs ok |
|
Stop at 33K events due to eventfilter not receiving ECRs |
|
ECR problem (33K event limit) fixed by
Thilo (ATLAS trigger) |
|
|
|
Tuesday evening and following night was
spent to then dedicated to adjust the SCT barrel readout timing for cosmic
triggers |
|
Used the scintillator trigger from TRT |
|
in the pit placed on top of ATLAS (on
level 8) |
|
TRT sector 13 on and partial sector 7 |
|
SCT all 4 barrels (2112 modules) except
3 cooling loops (~ 150 modules) |
|
No EC - barely enough C3F8 for all but focus
on integration instead of bringing in endcaps too (and risking to fall below
threshold) |
|
|
|
|
|
Tuesday night |
|
|
|
Switch to scintillator (cosmics)
trigger |
|
TRT already seeing tracks |
|
Started timing scan |
|
Accelerate timing adjustment by using signal
threshold of 1.2fC |
|
Gradually shift SCT timing and watch
for tracks on event display! |
|
Wednesday morning 20 Feb |
|
realized timing probably just out of range of SCT timing
range |
|
added 3 clock delay in CTP |
|
fixed SCT BCID FE/ROD mismatch |
|
synch fully with CTP and TRT |
|
started seeing tracks in final time bin |
|
|
|
the first cosmic tracks were
reconstructed in SCT and TRT within hours. |