¥February
15 we completed the sign-off of SCT endcaps, officially marking
the complete sign-off of whole SCT
¥February
18 to 20 the SCT (barrel) run in ATLAS
–Technical
RUN mainly to to integrate in the ATLAS readout
and control and prepare
for the next ATLAS M6 combined run
–A
chance to try global ATLAS integration with a large fraction
of the real detector cooled and powered.